After performing the above operations, the assembly phase begins. Our fitters have high knowledge and experience of every single machine produced, more than 45 models with multiple versions are available in the catalogue of ours wastewater treatment equiment. Our staff is constantly updated on product improvements, both for improvements, both for standard and customized equipment.
At the end of each assembly process, before proceeding with the preparation of the shipment, the machines are tested.
For Seft care and attention to detail is a very important phase, we pay particular attention to the finishing treatments, we perform micro-shot peening and pickling treatments to protect welds made and to an aesthetic aspect that is sure to be appreciated.